EIC will need to be written as Electrical Installation Certificate
PIR will need to be written as Periodic Inspection Report
MEIWC will need to be written as Minor Electrical Installation Works Certificate
Note that both these need attached to the first two but not the MEIWC.
- A Schedule of inspection
- A Schedule of test results
You will lose marks if you simply say Schedule of Tests.
To answer which is required, remember the clue is in the question.
A new circuit as been installed? Installed equates to installation, thus could be one of two, but since circuit added, is not a minor undertaking. This leaves us with Electrical Installation Certificate.
A report on the condition is required? There is only one report and this is the Periodic Inspection Report.
Initial Verification, or making sure in the first place, relates to the Electrical Installation Certificate.
Statutory documents are those passed by an Act of Parliment and could be The Health and Safety at Work Act 1974 or more likely the Electricity At Work Regulations 1989.
None statutory documents are likely to be BS 7671, Guidance Note 3, On site guide.